Ooni Koda
  1. Home
  2. /
  3. Newsfeed
  4. /
  5. OMV Petrom's first large photovoltaic project execution begins

OMV Petrom's first large photovoltaic project execution begins

November 13, 2024

 OMV petrom begins the execution of its first photovoltaic project, as the company awarded the EPPCC contract for the photovoltaic plant in Isalnita to an association of Romanian companies, according to an OMV Petrom press release.OMV Petrom, the largest integrated energy producer in Southeastern Europe, signed an EPCC - Engineering & Design, Procurement, Execution & Commissioning - type contract for the Isalnita solar project. The contract includes the construction of the photovoltaic park, the 110 kV power station for connection to the grid, as well as the operation and maintenance for a period of 2 years from commissioning.The contract was awarded to the association of Romanian companies Actual Connect S.R.L., Global Technical Systems S.A., Bit Invest S.R.L. and Alpin Sun S.R.L. following a competitive selection process. The association of companies accumulates an experience of over 700 MW installed in photovoltaic systems in countries such as Belgium, the Netherlands, Germany, Austria, Hungary and Romania, the press release reads."The signing of this contract marks a significant moment for our company, the start of the actual construction of the first large photovoltaic project fully developed by OMV Petrom. This project underlines our commitment to the renewable energy sector and demonstrates our ability to be leaders in the energy transition in Romania," said Franck Neel, OMV Petrom Executive Board Member responsible for Gas & Power, as quoted in the release.The Isalnita photovoltaic project, for which the final investment decision was taken in June of this year, is the first large-scale photovoltaic project fully developed by OMV Petrom. The park will have an installed capacity of approximately 89 MWp and is located in Isalnita commune, Dolj county. The estimated annual production will be approximately 130 GWh.The next step in this project is the start of construction, with completion and commissioning expected to take place in the first half of 2026.This project supports OMV Petrom's goal of having a portfolio of 2.5 GW of renewable energy projects, together with partners. The Isalnita photovoltaic power plant can develop strong synergies with other projects already in the portfolio, strengthening the security of electricity supply from renewable sources, the release also shows.Also, as part of the call for projects within Romania's National Recovery and Resilience Plan (PNRR), OMV Petrom has submitted a project to build a Battery Energy Storage System with a storage capacity of 36 MWh and a power injection into the grid of 18 MW. If successful, the system is to be installed within the Isalnita park, the company points out.  

Read in full - click here
Romania’s electricity production down 8.6% y/y in Jan-Sep

Lower electricity production amid slightly higher domestic demand and the reliance on intermittent renewable resources led to increasingly more situations when Romania imports electricity at the maximum capacity of its interconnectors, although the net electricity deficit is in the range of only some 3% of total consumption. The power storage capacities can smooth supply and […]

Romania's GDP up 0.9% y/y in Jan-Sep, negative base effects expected for Q4

Romania's economy increased by 1.1% y/y in Q3, disappointing many analysts and bringing the ytd growth rate to only 0.9% y/y in January-September, according to flash estimate data published by the statistics office INS. A Bloomberg survey indicated expectations for 1.6% y/y growth in Q3. Agriculture adds to the long list of economic sectors that dragged […]

Two more Romanians confirmed dead after devastating floods in Spain, no more missing

Two other Romanian citizens have been confirmed dead after the devastating floods that hit the Valencia region roughly two weeks ago. According to the Ministry of Foreign Affairs (MAE), this brings the total number of Romanian casualties to nine. All those previously reported missing have now been found safe. “The representatives of the Romanian Consulate […]

Report: Demand for logistics and industrial spaces shows 20% decline YoY in Romania

The demand for logistics and industrial spaces reached 575,000 sqm during the first 9 months of this year, a decrease of 20% compared with the same period of 2023, according to a report by real estate consulting company Cushman & Wakefield Echinox.  The figures for Q3 2024 reveal that 164,000 square meters were contracted, a […]

Renowned violinist and conductor André Rieu to perform in Cluj-Napoca in 2025

Dutch classical music star André Rieu will return to Romania for two concerts at BTarena in Cluj-Napoca on November 13 and 14, 2025. Rieu’s concerts in Romania, where he enjoys a high degree of popularity, have set multiple attendance records. In 2015 and 2016, he performed nine sold-out shows in Bucharest’s Constitution Square for over […]

Rammstein frontman Till Lindemann to perform in Romania in December 2025

Till Lindemann, the frontman of famous German rock band Rammstein, will embark on his "Meine Welt" tour across European arenas in the fall of 2025. Among his stops he is scheduled to perform in Romania on December 4, 2025, at Romexpo in Bucharest, as announced on his official website.  The "Meine Welt" tour will take […]