Ooni Koda
  1. Home
  2. /
  3. Newsfeed
  4. /
  5. Total costs for the restructuring of the Energy...

Total costs for the restructuring of the Energy Complex Oltenia are up to 3.94 billion euro

May 26, 2022

The European Commission published the Decision which mentions the approved measures included in the State Aid for restructuring in favour of EC Oltenia and the Plan for Recovery belonging to it, decision which was officially announced on 26th January 2022. The total costs for restructuring of the EC Oltenia are up to 3.94 billion euro.   “The European Commission has published the decision detailing the measures approved under the State restructuring aid in favor of EC Oltenia and the related restructuring plan, a decision that was officially announced on 26 January 2022. The EC Oltenia restructuring plan is based on two main pillars: Building new capacity based on solar and gas and reducing existing lignite-based capacity. The plan has been approved by the Romanian Government and the European Commission and must be implemented as a necessary measure of refurbishment and maintenance of CE Oltenia, given that the company is an essential component of the national energy system,” the company announced.   The total costs for restructuring are 3.94 billion euro. Out of this sum, approximately 2.7 billion euro are state funds which include a grant of approximately 896 million euro from the Modernisation Fund, destined to the new investments. The contribution of CE Oltenia will be 1.27 billion euro, source being the income from sales of electricity and partnerships and loans drawn by EC Oltenia.   The measures included in the Decision aimed at the observance of the criteria for the state aid    the company is already benefitting from and will benefit to the end of the period for restructuring, namely the end of 2026.   Thus, the restoration of profitability at the end of the restructuring period – which is an essential criterion in a state aid for restructuring – was achieved through measures to optimize existing capacities and expand the portfolio with the inclusion of new projects: Natural gas plants and photovoltaic parks with a total installed capacity of about 2.000 MW. In the period 2023-2025, blocks 4 Rovinari, 4 Turceni and 7 I?alnita will be in capacity reserve, and in the period 2026-2030, blocks 5 Rovinari, 6 Rovinari and 5 Turceni will be in capacity reserve. The operation of these blocks will be dictated by reasons related to security of energy supply or market conditions,” the company said.    In order to meet the criterion of structuring and adequate remuneration of the restructuring aid, several future actions from both significant shareholders – the Romanian State and Fondul Proprietatea – were included which relate to participation in capital operations.   In addition, the Romanian authorities have committed to implement a sufficient divestment of shares of the Romanian State in EC Oltenia by the end of the restructuring period in 2026, so as to ensure an additional remuneration of the State aid grant component. The assignment of at least 20% of the property rights will be made through a public offer of shares.   The size and structure of EC Oltenia’s own contribution to the total restructuring effort of EUR 3,94 billion is the third criterion that formed the basis for the favorable decision. Thus, the company was able to demonstrate that together with the amounts received from the electricity sales contracts it attracted considerable, additional sources from bank credits and contributions from selected partners to new projects.   The partnerships are being negotiated and will lead to the establishment of SPVs – project companies that will underpin the development of new projects – in the course of 2022.   The joint venture measure (SPV) was a mandatory element of the EC Oltenia restructuring plan in order to avoid distortions of competition and to ensure its own contribution to the restructuring cost of EUR 3,94 billion, these are the conditions necessary to be fulfilled for the approval of state restructuring aid. Moreover, the establishment of the lignite subsidiary is a measure that prevents cross-subsidization and thus distortions of competition.   Another measure is outsourcing of Craiova II, a measure which is implemented according to the initial calendar under the form of division, the new judicial entity having the same shareholders as EC Oltenia. It is the first measure which contributes to the creation of a viable player which will operate with an integrated model, from production to transport and distribution of thermal energy and will be able to access similar finances to the ones used by EC Oltenia for new projects.   The measure on the establishment of the lignite subsidiary involves the creation of an entity with separate legal and accounting personality from CE Oltenia, which will integrate the lignite-based electricity production activity, maintained under capacity reserve regime. The holding structure, which will be reached in the future following the steps described in the Restructuring Plan, is a model widely spread throughout the world.   As a result of the decarbonization process, emissions will fall from 8,4 million in 2022 to 4,1 million in 2025 and 3,7 million in 2030, with the use of lignite-based reserve capacities.   In the new global energy context, the restructuring plan offers a degree of flexibility, as there is a need for increased domestic production. Thus, there is the possibility of supplementary measures, temporary, whose effects can be adjusted until the end of the restructuring period.   This year, the company has already taken measures for the increase of coal production by 900,000 tons, which would deliver total energy of 600,000 MW, in one of the already existing capacities in Rovinari, Turceni or Isalnita.   EC Oltenia will hire, for a limited period of time, 600 people as mechanical locksmiths, electricians and welders in mining activity. More than half have already been employed and will begin work this month. It is a temporary measure, designed for this difficult context and which can be activated without, at the end of the implementation of the plan, changing its structure.    

Read in full - click here
Deloitte Romania assisted AQUILA, leader in distribution and logistics services for the consumer goods market, in the acquisition of Romtec Europa, producer of car care fluids and aerosols

Deloitte Romania assisted AQUILA, leader in the integrated distribution and logistics services for the fast-moving consumer goods market in Romania and the Republic of Moldova, in the acquisition of Romtec Europa, the company that produces car care fluids and aerosols. The transaction, valued at 3.2 million euros, was signed in December 2023 and completed recently, following approval from […]

Timiș - among the top counties with high agricultural potential CBRE Romania Analysis: Business Opportunities and Alternative Investment Perspectives

CBRE Romania, the leader in providing commercial real estate services, launches an analysis regarding the business potential and alternative investment and development opportunities in Timiș County. According to the analysis, Timiș stands out as a vital centre of Romanian agriculture, ranking first in agricultural area with 693.034 hectares and second in organically cultivated land area. […]

Romania, a profitable destination with over 4.5 million sqm of retail modern space at the end of 2024.

By the end of 2024 the stock of modern retail spaces will overpass 4.5 mln. sq. m setting a new record for Romania. Circa 186,000 sq. m could be added to country’s modern retail stock if taking into consideration under-construction projects. The popularity of the specialized format is noticed in the forecasted developments, claiming 95% […]

Cushman & Wakefield Echinox: On average, companies spend €15,000 on fitting out each employee's office space

The average office fit-out costs have increased by around 15-20% during the past 12 months, but they still remain among the lowest in the Central and Eastern Europe (CEE), according to data from the Cushman & Wakefield Echinox real estate consultancy company. With an average level of €943 per sq. m of office space, the […]

Romania is present through the RoTechMission delegation at the EU-Startups Summit Malta, one of the biggest events for tech startups in Europe

Romania is present at the 10th edition of the EU-Startups Summit in Malta, the biggest event for tech startups in Europe, through RoTechMission, a delegation organized by DiFine PR, Techcelerator and ROTSA (Romanian Tech Startups Association). More than 2,000 people, including 1,000 entrepreneurs and 300 investors, will attend the event, which takes place from May […]

AeroVacanțe, part of the Aerotravel group, operates 14 charter flights to Lesbos, the third largest island in Greece: "In 2024, Romanians want to travel to as many original and authentic destinations as possible. The demand for them increased by 25% compared to the same period last year"

AeroVacanțe, part of the Aerotravel group, is betting in 2024 on new destinations, more accessible for Romanians, as a result of the growing demand for holidays in new destinations untouched by mass tourism. Thus, the agency introduces for this summer 14 charter flights to Lesbos, the third largest island in Greece, where the costs of […]