Ooni Koda
  1. Home
  2. /
  3. Newsfeed
  4. /
  5. H1 2024: Industrial & Logistics Demand Doubles New...

H1 2024: Industrial & Logistics Demand Doubles New Supply

September 4, 2024

Companies leased 410,500 sq. m of industrial & logistics spaces in H1, a total which reflects a 25% drop when compared with H1 2023. However, the new demand had a share of 52% in the overall leasing volume in the same period (213,500 sq. m), more than double vs. the new supply, according to data from the Cushman & Wakefield Echinox real estate consultancy company.   Bucharest attracted 46% of the total take-up in H1 2024 (186,300 sq. m), followed by Arad (15%, 62,700 sq. m) and Timisoara, the second-largest industrial hub in Romania (14%, 58,600 sq. m). Ploiesti, Oradea and Sibiu were other important locations in terms of industrial & logistics activity.   Rodica Tarcavu, Partner Industrial Agency Cushman & Wakefield Echinox: ”The macroeconomic indicators were much better in Q2, as  inflation has been contracting in Romania for more than 6 months, reaching an average level of 6.8% during the last quarter. The National Bank of Romania has reacted by decreasing the monetary policy rate in June by 25 bp to 6.75%, the first such movement in 18 months. Moreover, the economy was highly resilient in H1, with GDP growth rates of 1.8% and 2.1% being recorded in Q1 and Q2 respectively. An overall annual growth of 2.7% is anticipated for 2024, a notable evolution given the still volatile macroeconomic and geopolitical context. All these variables create the context for another solid year for the industrial & logistics market, both in terms of supply and demand”.   The largest transaction closed in Q2 2024 was related to a 20,900 sq. m pre – lease by VAT Group within VGP Park Arad, followed by a 20,000 sq. m pre – lease by Deichmann in ELI Park 3 Bucharest.   Production and manufacturing companies were the most active players on the market throughout H1, with almost 100,000 sq. m of warehouse spaces being leased by those tenants, followed by logistics and distribution operators (63,000 sq. m), retail, e-commerce and FMCG companies with 48,000 sq. m, automotive sector (24,000 sq. m) and pharma (17,800 sq. m).   The total modern stock of industrial & logistics spaces reached almost 7.13 million sq. m at the end of Q2, as developers completed new projects with a total leasable area of ~104,000 sq. m across the country in H1 2024, among which around 60,000 sq. m were delivered in Q2.   The total development activity in H1 2024 slowed down when compared with H1 2023, when it accounted for 202,000 sq. m, while the estimated new supply for the next 18 months is at around 571,000 sq. m.  As such, the national stock could exceed 7.5 million sq. m by the end of the year.   Bucharest – Ilfov and Ploiesti have the largest share in the overall pipeline volume (110,000 sq. m each), followed by Brasov (78,000 sq. m) and Timisoara (66,000 sq. m).   The vacancy rate at national level has slightly decreased to 4.8%, while a further drop is expected by the end of 2024, as a result of the limited developments on a speculative basis.   The prime headline rents in Bucharest and in the main industrial & logistics destinations in Romania remained flat at levels ranging between €4.30 – €4.70/ sq. m/ month in Q2 2024. No significant changes are expected in the coming period concerning the rental levels for existing projects, especially those which have a higher degree of vacancy, while an upward trend is predicted for the new developments, due to the surging construction costs and land acquisition prices.      

The text of this article has been partially taken from the publication:
http://actmedia.eu/economic/h1-2024-industrial-logistics-demand-doubles-new-supply/109776
Read in full - click here
Endava selected as a partner in the OCRE 2024 framework to support Cloud Adoption in Research and Education

Endava (NYSE: DAVA), a global provider of digital transformation, has been selected as a partner in the Open Cloud for Research and Education (OCRE) 2024 framework. This EU-compliant procurement framework, administered by GÉANT, the collaboration of European National Research and Education Networks (NRENs), enables European educational institutions to access innovative cloud services, fostering digital transformation […]

Tate brothers “have every interest in returning to Romania,” justice minister says

Romanian justice minister Radu Marinescu  said during an interview that Andrew and Tristan Tate, who left Romania after their travel ban was lifted, have every interest in returning to comply with judicial procedures. The two are investigated for human trafficking and other offenses, including rape. The minister argued that the brothers have always claimed that […]

Media investigation exposes Călin Georgescu’s ties to Soros Foundation and USAID, after his public attacks on them

A new investigation from independent journalists at Recorder shows that far-right politician Călin Georgescu, who routinely accuses American-Hungarian billionaire George Soros of meddling in Romanian politics, partnered with the...

Workspace Studio reaches EUR 27 mln in 2024, with over 100,000 sqm of modern offices designed and furnished

Workspace Studio, a leader in ergonomic design solutions and employee-centered design, announces solid results for 2024, with a turnover of €27 million, up 20% from the previous year. This success was driven by large-scale projects for top companies as well as numerous collaborations with medium and small firms, all benefiting from the same commitment to […]

Romania presidential elections: MKOR study says Călin Georgescu leads voting intentions but Ilie Bolojan could win second round

A new study by MKOR shows that pro-Russian politician Călin Georgescu is the frontrunner in Romania’s presidential race, with 36.6% of voters favoring him in the first round. However, the data suggests that acting president Ilie Bolojan could defeat him in the runoff, where he would secure 42% of the votes against Georgescu’s 40%. Ilie […]

Western Romania: Țiriac Imobiliare gets permit for major mixed-use project in Timișoara

The City Hall of Timișoara, in western Romania, has approved the Zonal Urban Plan (PUZ) for the redevelopment of the former abattoir, paving the way for a large-scale transformation of the nearly five-hectare industrial site. The project, led by Țiriac Imobiliare through its subsidiary Goldale Real Estate SRL, will preserve the historical buildings while repurposing […]