Ooni Koda
  1. Home
  2. /
  3. Newsfeed
  4. /
  5. Key turnaround works completed at offshore terminal serving...

Key turnaround works completed at offshore terminal serving Petromidia refinery

October 2, 2025

 A key stage of technical turnaround works at the offshore marine terminal operated by Midia Marine Terminal (MTT), which serves the Petromidia refinery - Constanta County, have been completed, KMG International announced in a statement on Monday."The works carried out, which lasted around 10 days, provide us with full guarantees for uninterrupted operation of the only offshore terminal in Romanian territorial waters. This asset plays an important role in supplying the Petromidia refinery, and equipment maintenance is essential for achieving operational objectives under full safety and environmental protection conditions," said Mihai Branzoi, General Manager of Midia Marine Terminal.According to the company, the turnaround involved the replacement of four critical floating hoses - two 12-meter hoses, the first connected to the terminal and bearing the full movement of the flexible string under varied environmental and operating conditions, and another two hoses of about 9 meters each, the last in the string, which connect to the ship's manifold."The four hoses were manufactured by the Japanese company Yokohama specifically for the terminal, located 8.6 km offshore in the Black Sea. Each hose section weighs approximately 5 tons, features a double carcass, and can withstand a nominal pressure of 19 bar. Midia Marine Terminal operates the terminal at 8 bar. At the same time, during the works, the other hoses were cleaned of hydrocarbons, while about one-third of the marine equipment was tested to verify and guarantee operational safety. The connection between the terminal and the vessels is made through two floating strings, each over 250 meters long, and two subsea strings, each 33.5 meters long. The full terminal turnaround is carried out once every 8 years, but components subject to higher levels of mechanical stress, such as floating hoses, are replaced every 2 years," the release states.The maintenance works involved over 40 people from MMT and Rominserv, the general contractor of the KMG International Group (Rompetrol)."Throughout the turnaround, the supply of raw materials to the Petromidia refinery remained unaffected, with the marine terminal continuing to unload operations on a single line. In August alone, five vessels were unloaded, totaling over 400,000 tons of crude oil, 80% of which originated from Kazakhstan," the company notes.The terminal operated by MMT is a Single Point Mooring (SPM) system, consisting of a static part fixed to the seabed by an anchoring system and a second part to which the vessel is connected, allowing it to freely rotate around the static part in response to wind, current, and waves.The maximum operating throughput is 7,000 m?/h, which means that a vessel carrying between 80,000 and 160,000 tons can be unloaded within 24 to 36 hours.  

Read in full - click here
One last star to shine: Corinthia Bucharest prepares the final act of its Michelin Dinner Series

Some dinners are eaten. Others are remembered. At Corinthia Grand Hotel du Boulevard, the past few months have unfolded like a quiet culinary opera. One by one, Europe’s most celebrated chefs arrived, took over the kitchen of Boulevard 73 and left behind more than menus; they left stories. Now, on December 4, the curtain falls. […]

HORIZON CITY - The New Residential Anchor of Northern Bucharest

HORIZON CITY, a €130 million residential project, is emerging as one of the most solid and forward-thinking developments in the Pipera area—both through its scale and through the modern direction it sets for the new residential standards in the north. Developed across nearly 23,000 sqm, with 699 apartments and 926 parking spaces, the project brings […]

Romania’s forestry authority Romsilva puts 16,000 Christmas trees up for sale

Romania’s National Forest Administration, or Romsilva, announced that it is putting over 16,000 Christmas trees up for sale over the winter in a press release published on Thursday, November 27. The trees can be purchased directly from the offices of the forestry districts. Prices range between RON 17 (EUR 3.3) for a spruce...

New 14 km segment of Romania’s A7 Moldova highway inaugurated

Lot 3 Pietroasele–Buzău of Romania's A7 highway, also known as the Moldova highway, was inaugurated on Thursday, November 27. The newly inaugurated segment is 13.9 km long. The A7 connects Romania’s historic regions of Muntenia, the southern part of the country, with Moldova, the eastern part. “We are opening another 13 km of the Moldova Motorway […]

Romania’s Sinaia inaugurates alpine coaster for year-round mountain fun

The City Hall of Sinaia, a popular mountain town roughly 120 km north of Bucharest, announced that a new attraction, the alpine coaster on Pârtia Nouă, will officially open on December 1. The installation, located in the ski area near the Sinaia Gondola, features what the authorities say is the longest track of its kind […]

Romania scores first win in group stage of Women’s Handball World Championship

The Romanian national team debuted with a victory in Group A of the Women’s Handball World Championship, organized in the Netherlands and Germany. Romania won 33–24 (13–12) against Croatia in the Ahoy Arena in Rotterdam on Thursday, November 27. The Romanian team dominated the match in the second half, left backer Sorina-Maria Grozav scoring 7 […]